The Dreamer Visioned Life as it might be, And from his dream forthright a picture grew, A painting all the people thronged to see, And joyed therein--till came the Man Who Knew, Saying: "'Tis bad! Why do ye gape, ye fools! He painteth not according to the schools."
Wednesday, October 7, 2009
Hydro Electric Production in Ontario
The production of Hydrogen from new Hydro Electric facilities would require a new agency or better yet a private consortium that would control its own production, The production facilities would operate in a similar manner to oil refineries in the oil and gas industry. Hydrogen would be produced by optimised off grid power that would have little in common with Ontario Power Generation.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment